BUILDINGS 100 AND 102 ALL UNITS
STARTING MONDAY, MARCH 18 TH THROUGH
FRIDAY, MARCH 22 nd , 2024.
ELECTRICAL CONTRACTORS WILL BE REPLACING THE
ELECTRIC BREAKER PANELS INSIDE EVERY UNIT OF THE
BUILDING BY DOING SECTIONS OF THE BUILDING EACH
DAY; STARTING IN BLDG. 100.
CONTRACTORS WILL NEED ACCESS TO YOUR UNIT
STARTING AROUND 8:30 AM AND THE ELECTRICTY
WILL BE OFF, SHORTLY THEREAFTER, DURING THE
DAYTIME HOURS.
WHEN THE CONTRACTORS ARE REPLACING THE
BREAKER PANELS IN THE UNITS ON YOUR SIDE OF
YOUR BUILDING, YOU WILL NOT HAVE POWER.
THE ELECTRICITY WILL BE RESTORED AS SOON AS
POSSIBLE, ON THE SAME DAY AFTER THE BREAKER
REPLACEMENTS ARE COMPLETED, BEFORE DARK.
THANK YOU FOR YOUR UNDERSTANDING AND COOPERATION
WITH THIS MANDATORY ELECTRICAL UPGRADE.