STARTING on MONDAY, APRIL 1st through FRIDAY April 5th, 2024, and MONDAY, April 8th through FRIDAY APRIL 12th, 2024, or as soon as possible:
The welder will be working at the BACK of the building for the installation of new flights of stairs FROM THE FIRST FLOOR TO THE SECOND FLOOR AND THE SECOND FLOOR TO THE THIRD FLOOR. (The entire flight of the back of the building).
While this work is in progress, these stairs will not be available for anyone to use. There will be a barrier to prevent/protect anyone from the missing stair well area. Stay away from this area as it will be dangerous.
Again, stay away from the area while the new stairs are being installed. Replacement of all flights of stairs should be completed and re-opened as soon as possible, estimated for April 12th, 2024.
Thank you for your cooperation as we work to make improvements to the building and the property to ensure everyone's safety.